Clean Air
An NFOŚiGW programme for owners of single-family homes or separate units within them with a land register, for replacing inefficient heating sources and thermal modernisation. For applications from 20 July 2026, three support levels — 40%, 70% or 100% of eligible costs, excluding VAT — depend on income and the other programme conditions; limits apply to individual costs. The grant can be combined with thermal modernisation tax relief under tax rules.
Check if you qualify →Who can apply for Clean Air?
- Owner or co-owner of a single-family home or a separate unit within it with a land register; the programme excludes buildings or units for which the application for a building permit, project approval or construction notification was submitted after 31 December 2020.
- The programme does not cover projects in seasonally used buildings or utility buildings.
- As a rule, at least 3 years of ownership by the application date. The programme from 20 July 2026 provides exceptions for inheritance, adverse possession and combining units, and a reduction to 1 year for specified acquisitions of a share of at least 50%; details in sections 8.1–8.3.
For applications from 20 July 2026: basic level — applicant’s annual income up to PLN 135,000; increased level — average monthly income up to PLN 2,250/person in a multi-person household or PLN 3,150 in a single-person household; highest level — up to PLN 1,300/person or PLN 1,800, or confirmed entitlement to a benefit specified in the programme for the required period. The highest level also requires useful energy demand for heating above 140 kWh/(m²·year). Other conditions, including those concerning marriage and business activity, are set out in section 8 of the programme; cost limits are in Annex 2.
How to apply?
Step 1: check eligibility
Check the programme conditions for applications from 20 July 2026. An energy audit and an audit summary document attached to the application are required. The scope of work and required reduction in energy demand depend on the building’s condition under table 9.2.2; the programme also allows projects without replacing the heating source.
Step 2: choose a contractor
Where required by law, services must be performed by persons or entities holding the relevant qualifications and permits, in accordance with the law and standards.
Step 3: submit the application
Apply to the WFOŚiGW responsible for the building’s location using the current form through GWD or gov.pl; without an electronic signature, submit a signed GWD printout with attachments. The highest level and the increased level with pre-financing require an operator’s involvement. Attach the energy audit summary document and other attachments required for the chosen pathway.
Step 4: implementation and settlement
After receiving funding, account for the project through a payment application with the required documents. The implementation period, counted from the funding application date, is up to 24 months for grants and grants with pre-financing, or up to 18 months for grants for partial repayment of loan principal; section 11.10 of the programme and the deadline of 30 June 2032 apply.
Frequently asked questions
- Can I combine the Clean Air grant with the thermal modernisation PIT relief?
- Yes, the grant can be combined with thermal modernisation tax relief. The part of the expense financed by the grant cannot be deducted (art. 26h para. 5 of the PIT Act). Example: an expense of PLN 50,000 and a grant of PLN 30,000 leave PLN 20,000; this can be deducted from the tax calculation base if the other relief conditions are met.
- What does the date 31 December 2020 refer to?
- In the programme applicable to applications from 20 July 2026, it refers to the date of submitting the application for a building permit or a separate project approval application, or the notification of construction or works where no permit is required. It is not the date the house was put into use.
- What equipment qualifies?
- Annex 2 sets out eligible costs for applications from 20 July 2026: energy performance assessment, specified heating sources and installations, insulation, windows and doors, and ventilation. Technical requirements and maximum grants are specified separately for each category. Heat pumps and specified biomass boilers are subject to ZUM list requirements, with the exception for a device suspended or removed from the list after an advance invoice, described in footnote 3. This version of the programme provides no grants for PV or gas boilers.
- How long does the application review take?
- The rules for applications from 20 July 2026 provide for review within 60 calendar days of receipt by the competent WFOŚiGW. Requests for additional documents or explanations may extend this period. The deadline is indicative.
Check other benefits
The calculator also checks the thermal modernisation PIT relief and other forms of support for property owners — in 2 minutes.
Launch the calculator →